Terms and their meanings
A
B
C
- Captive Market
- CDA
- Centralized vehicle-to-grid facilities
- Central Dispatch
- Certificate of Authority (COA)
- Certificate of Confirmation of Commerciality (COCOC)
- Certificate of Inspection
- Certificate of Registration (COR)
- Charging fee
- Charging station
- Charging station service provider
- Clearance
- COA
- COCOC
- Commercial Operations
- Commercial Quantities
- Commercial use charging stations
- Competition Rules
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Contract Area
- Contract Year
- Control
- Controlled items
- Cooperative Development Authority (CDA)
- COR
- Corporation Code
- CREVI
- Cyber-attack
D
- DBM
- DBT
- Declaration of Commerciality (DOC)
- Decommissioning
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Design basis threat (DBT)
- Device
- Direct Application
- Disposal
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOC
- DOE
- DOF
- Dose limit
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Vehicle Industry Development Act (EVIDA)
- Electric vehicle (EV)
- Embedded Generator (EG)
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- ERB
- ERC
- EV
- EV industry
- Excluded
- Exclusion
- Exempt
- Exemption
- Export
- EZs
F
G
H
I
- IAEA
- ILW
- IMO
- Import
- Importer
- Independent Market Operator (IMO)
- Independent Power Producer Contracts of the National Power Corporation (IPP Contracts)
- Independent Power Producer (IPP)
- Infrastructure Projects
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
L
M
- Malampaya fund
- Malampaya Natural Gas Project
- Manufacturer
- Marginalized End-users
- Market Fees
- Market Operator (MO)
- Material Out of Regulatory Control (MORC)
- Merit Order Dispatch Instructions
- Micromobility
- Missionary electrification
- MK-SAGF
- MO
- MORC
- Murang Kuryente Act
- Murang Kuryente Special Account in the General Fund (MK-SAGF)
N
- National Electrification Administration (NEA)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NEA
- Net government share
- Net national government share
- Net production proceeds
- Notification
- NPC
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
O
P
- PDA
- PEP
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Energy Plan (PEP)
- Philippine National Nuclear Energy Safety Act
- Philippine Stock Exchange (PSE)
- Physical protection
- Plug-in hybrid electric vehicle
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Pressurized water reactors (PWRs)
- Pre-Determined Area (PDA)
- Private buildings and establishments
- Privatization
- Production Area
- PSALM
- Public buildings and establishments
- Public Utility Vehicle (PUV)
- PUV
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Referendum
- Registration
- Related Group
- REMB
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Operating Contract (RE Operating Contract)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Representative Threat Statements (RTS)
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- RE Applicant
- RE Application
- RE Developers
- RE Operating Contract
- RE Project
- RE Project for Non-Commercial Operations
- RE Project for Own-Use
- RORB
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- Security
- Self-generating charging stations
- Self-Generation Facility
- Sensitive digital assets (SDAs)
- SEOC
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Solar Energy Operating Contract (SEOC)
- Source
- Spent fuel
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity