Terms and their meanings
A
B
C
- Captive Market
- CDA
- Centralized vehicle-to-grid facilities
- Central Dispatch
- Certificate of Authority (COA)
- Certificate of Confirmation of Commerciality (COCOC)
- Certificate of Inspection
- Certificate of Registration (COR)
- Charging fee
- Charging station
- Charging station service provider
- Civil Code of the Philippines
- COA
- COCOC
- Commercial Operations
- Commercial Quantities
- Commercial use charging stations
- Competition Rules
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Contract Area
- Contract Year
- Control
- Conveyance of electricity
- Cooperative Development Authority (CDA)
- COR
- Corporation Code
- CREVI
D
- Dangerous structure
- DBM
- Declaration of Commerciality (DOC)
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Human Settlements and Urban Development (DHSUD)
- Department of Interior and Local Government (DILG)
- Department of Public Works and Highways (DPWH)
- DHSUD
- DILG
- Direct Application
- Distribution Code
- Distribution lines
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOC
- DOE
- DOF
- DPWH
- DU
E
- Easement fee
- EC
- Economic Zones (EZs)
- Ecosystem
- Ecosystem accounting
- Ecosystem services
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Vehicle Industry Development Act (EVIDA)
- Electric vehicle (EV)
- Embedded Generator (EG)
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Environmental indicators
- ERB
- ERC
- EV
- EV industry
- EZs
F
G
H
I
L
M
N
- National Building Code of the Philippines
- National Commission on Indigenous People (NCIP)
- National Electrification Administration (NEA)
- National Grid Corporation of the Philippines (NGCP)
- National Housing Authority (NHA)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- Natural capital
- Natural Capital Accounting
- NCIP
- NEA
- NGCP
- NHA
- NPC
O
P
- PDA
- PEC
- PENCAS Act
- PEP
- Person
- Philippine Coconut Authority (PCA)
- Philippine Ecosystem and Natural Capital Accounting System (PENCAS) Act
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine National Police (PNP)
- Philippine Stock Exchange (PSE)
- Plug-in hybrid electric vehicle
- PNP
- Power Commission
- Power Development Program (PDP)
- Power lines
- Power Line Corridor (PLC)
- Power line obstruction
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Pre-Determined Area (PDA)
- Private buildings and establishments
- Privatization
- Production Area
- Public buildings and establishments
- Public Utility Vehicle (PUV)
- PUV
R
- Referendum
- Related Group
- Relocation
- REMB
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Operating Contract (RE Operating Contract)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Responsible entity
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- RE Applicant
- RE Application
- RE Developers
- RE Operating Contract
- RE Project
- RE Project for Non-Commercial Operations
- RE Project for Own-Use
- RORB
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Self-generating charging stations
- Self-Generation Facility
- SEOC
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Solar Energy Operating Contract (SEOC)
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Substantial relocation
- Subtransmission Assets
- Subtransmission Systems
- Sub-transmission lines
- Sub-transmission system
- Supplier
- Supplier’s charge
- Supply of Electricity
- System of Environmental-Economic Accounting (SEEA)