Terms and their meanings
A
- Accredited Conformity Assessment Body (CAB)
- Action
- Activity
- Adaptation
- Adaptive capacity
- Adulterated LPG
- Affiliate
- AFP
- Aggregator
- Agricultural and fisheries mechanization
- Ancillary Equipment
- Ancillary Product
- Ancillary Services (AS)
- Anthropogenic causes
- Anti-Obstruction of Power Lines Act
- Armed Forces of the Philippines (AFP)
- Associated facilities
- Attestation
- Audit
- Audit criteria
- Auto-LPG
- Auto-LPG container
- Auto-LPG dispensing station
B
C
- Captive Market
- Centralized LPG piping system
- Central Dispatch
- Certificate of Conditional Release
- Certificate of Exemption
- Certification
- Certification Body
- Civil Code of the Philippines
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Code
- Concession Contract
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contestable Market
- Control
- Conveyance of electricity
- Cross-filling
- Cylinder container
- Cylinder valve
D
- Dangerous structure
- DBM
- Dealer
- Defective pressure vessel
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Human Settlements and Urban Development (DHSUD)
- Department of Interior and Local Government (DILG)
- Department of Public Works and Highways (DPWH)
- Determination
- DHSUD
- DILG
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distribution Code
- Distribution lines
- Distribution of Electricity
- Distribution projects
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Domestic regulator
- DPWH
- DRRM
- DU
- Durable marking
E
- Easement fee
- EC
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Electronic document
- Employee
- End-consumer
- End-user
- Energy project
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Virtual One-Stop Shop (EVOSS)
- EPIRA
- ERB
- ERC
- Evaluation
- EVOSS
- Excess-flow valve
G
I
- ICC
- Import Commodity Clearance (ICC)
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Inspection
- Inspection body
- International Standard
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
- LCCAP
- LGU
- License to Operate (LTO)
- Lifeline Rate
- Liquefied Petroleum Gas (LPG)
- Local Climate Change Action Plan (LCCAP)
- Local Government Unit (LGU)
- Lot No.
- LPG
- LPG bulk storage tank
- LPG cartridge
- LPG cylinder
- LPG cylinder buyback
- LPG cylinder exchange
- LPG Cylinder Exchange and Swapping Program
- LPG cylinder improvement
- LPG Cylinder Improvement Program
- LPG Cylinder Improvement Program fund
- LPG cylinder owner
- LPG cylinder swapping
- LPG cylinder swapping center
- LPG Industry Development Plan
- LPG industry participants
- LPG Industry Regulation Act
- LPG pressure vessel
- LPG seal
- LTO
M
N
- National Building Code of the Philippines
- National Climate Change Action Plan (NCCAP)
- National Commission on Indigenous People (NCIP)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Grid Corporation of the Philippines (NGCP)
- National Housing Authority (NHA)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NCCAP
- NCIP
- NEA
- NFSCC
- NGCP
- NHA
- NPC
O
P
- PEC
- PEP
- Permanent marking
- Permit
- Permitting process
- Philippine Coconut Authority (PCA)
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine National Police (PNP)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Pilferage
- PNP
- Power Development Program (PDP)
- Power lines
- Power line obstruction
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- PPP Project
- Preferred Financial Package
- Pressure Relief Valve
- Privatization
- Procuring entity
- Product Certification
- Proponent
- Prospective Disaster Risk Reduction and Management
- PS License
- Public-Private Partnership (PPP) Project
R
S
- Sampling
- Scrappage
- Scrapped cylinder
- Seal manufacturer
- Sea level rise
- Serial No.
- SO
- SOC
- SPUG
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stranded Debts of NPC
- Submission (of an electronic document)
- Substandard pressure vessel
- Substantial relocation
- Subtransmission Assets
- Sub-transmission lines
- Sub-transmission system
- Supplier
- Supplier’s charge
- Supply of Electricity
- Surveillance
- System Operator (SO)
T
- Tall growing plants
- Tare weight
- TDP
- Technical Regulation
- Terminal
- Testing Laboratory
- Test Report
- Third party
- Timeframe
- Trademark owner
- Trade name
- TRANSCO
- Transmission Charge
- Transmission Development Plan (TDP)
- Transmission Facilities
- Transmission lines
- Transmission Network Provider (TNP)
- Transmission of Electricity
- Transmission projects
- Transmission System