Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- CI
- CII
- Clearance
- Competition Rules
- Computer Security and Incident Response Team (CSIRT)
- Concessionaire
- Concession Contract
- Condonation
- Confidentiality
- Contestable Market
- Contiguous Area
- Contingency Plan
- Control
- Controlled items
- Cooperative Development Authority (CDA)
- Corporation Code
- Critical Information Infrastructure (CII)
- Critical Infrastructure (CI)
- CSIRT
- Cyber
- Cybercrime
- Cybersecurity
- Cybersecurity Incident
- Cyber Resilience
- Cyber-attack
D
- DA
- Data Sharing Agreement (DSA)
- DBM
- DBT
- Decommissioning
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy Act of 1992
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Labor and Employment (DOLE)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Department of Transportation and Communications (DOTC)
- Design basis threat (DBT)
- Device
- Diesel
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disposal
- Disruptive events
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Dose limit
- DSA
- DTI
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Embedded Generator (EG)
- End-user
- Energized Area
- Energy project
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Resiliency
- Energy Sector
- ERB
- ERC
- Excluded
- Exclusion
- Exempt
- Exemption
- Export
- EZs
F
G
I
- IAEA
- ICS
- ILW
- IMO
- Import
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Industrial Control System (ICS)
- Industrial Internet of Things (IIoT)
- Information Security
- Information Technology (IT)
- Integrity
- Intensity
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Internet of Things (IoT)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IoT
- IPP
- IPP Administrator
- IT
L
M
N
P
- PAP
- PCA
- PEIS
- PEP
- Person
- Personal Information
- Petroleum Depot
- Petroleum Terminal
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Biofuels Program
- Philippine Energy Plan (PEP)
- Philippine National Computer Emergency Response Team
- Philippine National Computer Emergency Response Team (NCERT-PH)
- Philippine National Nuclear Energy Safety Act
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- Physical protection
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Pressurized water reactors (PWRs)
- Priority Action Plan (PAP)
- Privacy
- Privatization
- Public Service
- Public Utility
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Rapid Earthquake Damage Assessment System (REDAS)
- RCP
- REDAS
- Referendum
- Registration
- Related Group
- Renewable Energy Sources (RE Sources)
- Representative Threat Statements (RTS)
- Resiliency
- Resiliency Compliance Plan (RCP)
- Resource recovery
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- RE Sources
- Risk
- RORB
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- Security
- Self-Generation Facility
- Sensitive digital assets (SDAs)
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Source
- Spent fuel
- SPUG
- SRA
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Sugarcane industry
- Supplier
- Supplier’s charge
- Supply of Electricity