Terms and their meanings
A
B
C
- Captive Market
- CECO
- CEM
- Central Dispatch
- Certificate of Conditional Release
- Certificate of Exemption
- Certification
- Certification Body
- Certified Energy Conservation Officer (CECO)
- Certified Energy Manager (CEM)
- Clearance
- Code
- Code of Practice on Energy Labelling of Products (COPE)
- Commission
- Concession Contract
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contestable Market
- Controlled items
- COPE
- Co-Generation Facility
- Customer Service Charge
- Cyber-attack
- Cylinder container
- Cylinder valve
D
- DBT
- Decommissioning
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Designated establishment
- Design basis threat (DBT)
- Determination
- Device
- Disposal
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOE Energy Audit Team
- DOF
- Domestic regulator
- Dose limit
- DU
E
- EC
- ECCR
- EECO
- EEC Officer
- EEC Professionals
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- End-user
- Energy
- Energy Audit
- Energy Auditor
- Energy Audit Report
- Energy conservation
- Energy Consumption and Conservation Report (ECCR)
- Energy efficiency
- Energy Efficiency and Conservation Act
- Energy Efficiency and Conservation Officer (EEC Officer)
- Energy Efficiency and Conservation Office (EECO)
- Energy efficiency projects
- Energy end user
- Energy labeling
- Energy management
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Service Company (ESCO)
- EPIRA
- ERB
- ERC
- ESCO
- Evaluation
- Excess-flow valve
- Excluded
- Exclusion
- Exempt
- Exemption
- Export
G
I
- IAEA
- ICC
- ILW
- Import
- Import Commodity Clearance (ICC)
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Inspection
- Inspection body
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- International Standard
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
- Isolated Distribution System
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
M
N
- National Electrification Administration (NEA)
- National Energy Efficiency and Conservation Coordinating Officer (NEECCO)
- National Energy Efficiency and Conservation Database (NEECD)
- National Energy Efficiency and Conservation Plan (NEECP)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NEA
- NEECCO
- NEECD
- NEECP
- Notification
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
P
- PEP
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Energy Plan (PEP)
- Philippine National Nuclear Energy Safety Act
- Philippine National Standards (PNS)
- Philippine Qualifications Framework (PQF)
- Philippine Stock Exchange (PSE)
- Physical protection
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- PQF
- Practice
- Pressure Relief Valve
- Pressurized water reactors (PWRs)
- Privatization
- Product Certification
- PS License
- PWRs
R
S
- Safeguards
- Safeguards Agreements
- Safety
- Sampling
- Scrapped cylinder
- SDA
- Security
- Sensitive digital assets (SDAs)
- Serial No.
- SOC
- Source
- Specific energy consumption
- Spent fuel
- Spot-Check
- SPUG
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity
- Surveillance