Terms and their meanings
A
B
C
- Capacity
- Captive Market
- Central Dispatch
- CI
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Commission
- Concession Contract
- Connection Assets
- Contestable Market
- Contingency Plan
- Conventional Energy Sources
- Conventional Transportation System
- Co-Generation Facility
- Co-generation systems
- Critical Infrastructure (CI)
- Customer Service Charge
D
- Decommissioning
- Decommissioning and Abandonment
- Delivery
- Demand Side Management
- DENR
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disaster Risk Reduction and Management (DRRM)
- Disruptive events
- Distributed generation
- Distribution
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DRRM
- DTI
- DU
E
- EC
- Ecosystem
- Ecosystem accounting
- Ecosystem services
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Embedded Generating Facilities
- End-user
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Sector
- Environmental indicators
- EPIRA
- ERB
- ERC
- Expansion
G
- Gas Policy
- Gender mainstreaming
- Generating Plant
- Generating Unit
- Generation Company
- Generation Facility
- GeoRiskPH
- Geothermal energy
- Geothermal Energy Systems
- Geothermal Resources
- GHG
- Global Warming
- Government Financial Institutions
- Government Share
- Greenhouse effect
- Greenhouse gases (GHG)
- Green Energy Option
- Grid
- Grid Code
H
I
L
M
N
- National Climate Change Action Plan (NCCAP)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National government share
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- Natural capital
- Natural Capital Accounting
- Natural gas
- Natural Gas Sales and Purchase Agreement (NGSPA)
- NCCAP
- NEA
- Network Service Provider (NSP)
- Net Metering
- NFSCC
- Non-power applications
- NPC
- NSP
O
P
- PAP
- Participant
- PDNGI
- PDNGI Facility
- PDNG Dev Plan
- PDNG Distribution Code
- PDNG Distribution Dev Plan
- PDNG Transmission Code
- PDNG Transmission Dev Plan
- PDNG Transmission System
- PEIS
- PEMC
- PENCAS Act
- PEP
- Permit
- Permit Holder
- Philippine Downstream Natural Gas Development Plan (PDNG Dev Plan)
- Philippine Downstream Natural Gas Distribution Code (PDNG Distribution Code)
- Philippine Downstream Natural Gas Distribution Development Plan (PDNG Distribution Dev Plan)
- Philippine Downstream Natural Gas Distribution System (PDNG Distribution System)
- Philippine Downstream Natural Gas Industry (PDNGI)
- Philippine Downstream Natural Gas Transmission Code (PDNG Transmission Code)
- Philippine Downstream Natural Gas Transmission Development Plan (PDNG Transmission Dev Plan)
- Philippine Downstream Natural Gas Transmission System (PDNG Transmission System)
- Philippine Ecosystem and Natural Capital Accounting System (PENCAS) Act
- Philippine Electricity Market Corporation (PEMC)
- Philippine Energy Plan (PEP)
- Philippine LNG Storage and Regasification Terminal Code (PLSR Terminal Code)
- Philippine LNG Storage and Regasification Terminal Development Plan
- Philippine National Oil Company (PNOC)
- Philippine Stock Exchange (PSE)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- PLSR Terminal Code
- PNOC
- Power applications
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Preferred Financial Package
- Priority Action Plan (PAP)
- Privatization
- Prospective Disaster Risk Reduction and Management
R
- Rapid Earthquake Damage Assessment System (REDAS)
- RCP
- REDAS
- Registered RE Developer
- Rehabilitation
- REM
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Market (REM)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Gases
- Renewable Portfolio Standards (RPS)
- REPF
- Reselling
- Resiliency Compliance Plan (RCP)
- Restructuring
- Retail Rate
- RE Act of 2008
- RE Developers
- RE generating unit with intermittent RE resources
- RE Resources
- RE Service Contract
- RE Systems
- RPS
- Rural Electrification
S
- Sea level rise
- Self-Generation Facility
- SGSO
- Small Grid System Operator (SGSO)
- Small Power Utilities Group (SPUG)
- Solar Energy
- Solar Energy Systems
- SPUG
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- successors-in-interest
- Supplier
- Supplier’s charge
- Supply
- Supply of Electricity
- System of Environmental-Economic Accounting (SEEA)