Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Competition Rules
- Competitive selection process for microgrid system provider (CSP)
- Concessionaire
- Concession Contract
- Condonation
- Congress
- Contestable Market
- Contiguous Area
- Control
- Cooperative
- Cooperative Development Authority (CDA)
- Corporation Code
- CSP
D
- DBM
- Decentralized power generation (DPG)
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Dependable and adequate service
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DRRM
- DU
- DU operated microgrid system
E
F
G
I
- Illegal trading in petroleum and/or petroleum products
- IMO
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Interest rate per centum per annum
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- Island mode
- Isolated microgrid system
L
M
- Mainstreaming
- Marginalized End-users
- Market Fees
- Market Operator (MO)
- Market Share
- Merit Order Dispatch Instructions
- MGSP
- Microgrid system
- Microgrid Systems Act
- Microgrid system provider service contract (MSC)
- Microgrid system provider (MGSP)
- Missionary electrification
- Misuse of allocation
- Mitigation
- Mitigation potential
- MO
- MSC
N
- NABI
- National Climate Change Action Plan (NCCAP)
- National Economic Development Authority (NEDA)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- NCCAP
- NEA
- NEDA
- NEDA-FS
- NFSCC
- Non-profit
- Notice of Allowable Bioethanol Importation (NABI)
- NPC
- NPC Graduation Plan
- NTER
P
- PEP
- Person
- Petroleum Fuel Product Adulteration
- Philippine Energy Plan (PEP)
- Philippine Stock Exchange (PSE)
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- PPP Project
- Preferred Financial Package
- President
- Privatization
- Procurement Plan
- Prospective Disaster Risk Reduction and Management
- Public service entities
- Public-Private Partnership (PPP) Project
R
S
- Sea level rise
- Self-Generation Facility
- Service
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity
- Supply Sales
- Synchronized mode