Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- Clearance
- Commercial-scale WTE facility
- Competition Rules
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Continuous Emissions Monitoring System
- Control
- Controlled items
- Cooperative Development Authority (CDA)
- Corporation Code
- Cost of Goods Sold
- Co-generation systems
- Cyber-attack
D
- DA
- DBM
- DBT
- Decommissioning
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Labor and Employment (DOLE)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Department of Transportation and Communications (DOTC)
- Design basis threat (DBT)
- Device
- Diesel
- Disposal
- Distributed generation
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Dose limit
- DTI
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Embedded Generator (EG)
- Emission
- End-user
- Energized Area
- Energy
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Environmental risk assessment
- EPIRA
- ERB
- ERC
- Excluded
- Exclusion
- Exempt
- Exemption
- Export
- EZs
F
G
H
I
- IAEA
- ILW
- IMO
- Import
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
L
M
N
- National Biofuels Program
- National Electrification Administration (NEA)
- National Government
- National government share
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NBB
- NEA
- Net Metering
- Non-power applications
- Notification
- NPC
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
O
P
- PCA
- PEMC
- PEP
- Person
- Petroleum Depot
- Petroleum Terminal
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Biofuels Program
- Philippine Electricity Market Corporation (PEMC)
- Philippine Energy Plan (PEP)
- Philippine National Nuclear Energy Safety Act
- Philippine National Oil Company (PNOC)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Physical protection
- PNOC
- Pollution Abatement System
- Power applications
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Pressurized water reactors (PWRs)
- Pre-processing
- Privatization
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Referendum
- Registered RE Developer
- Registration
- Related Group
- REM
- Renewable Energy Certificate
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Market (REM)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Registrar (RE Registrar)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Sources (RE Sources)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Energy Trust Fund (RETF)
- Renewable Portfolio Standards (RPS)
- REPF
- Representative Threat Statements (RTS)
- Resource recovery
- Restructuring
- Retail Competition
- Retail Rate
- RETF
- Return-On-Rate-Base (RORB)
- RE Act of 2008
- RE Certificate
- RE Developers
- RE generating unit with intermittent RE resources
- RE Registrar
- RE Resources
- RE Service Contract
- RE Sources
- RE Systems
- RE Trust Fund (RETF)
- RORB
- RPS
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- Security
- Self-Generation Facility
- Sensitive digital assets (SDAs)
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Solar Energy
- Solar Energy Systems
- Solid Waste Management Plan
- Source
- Spent fuel
- SPUG
- SRA
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Sugarcane industry
- Supplier
- Supplier’s charge
- Supply of Electricity
- SWM Plan