Terms and their meanings
A
- Action
- Activity
- Adaptation
- Adaptive capacity
- Adjusted net savings
- Adulterated LPG
- Affiliate
- AFP
- Aggregator
- Ancillary Equipment
- Ancillary Services (AS)
- Anthropogenic causes
- Anti-Obstruction of Power Lines Act
- Armed Forces of the Philippines (AFP)
- Associated facilities
- ATO
- Authority to Operate (ATO)
- Auto-LPG
- Auto-LPG container
- Auto-LPG dispensing station
B
C
- Candidate
- Captive Market
- Centralized LPG piping system
- Central Dispatch
- Certificate of Compliance (COC)
- Certification
- Civil Code of the Philippines
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- COC
- Commission
- Competitive selection process for microgrid system provider (CSP)
- Concession Contract
- Contestable Market
- Control
- Conveyance of electricity
- Co-Generation Facility
- Cross-filling
- CSP
D
- Dangerous structure
- DBM
- Dealer
- Decentralized power generation (DPG)
- Deepwater Contract
- Deepwater Contractor
- Deepwater Well
- Defective pressure vessel
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Human Settlements and Urban Development (DHSUD)
- Department of Interior and Local Government (DILG)
- Department of Public Works and Highways (DPWH)
- DHSUD
- DILG
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distribution Code
- Distribution lines
- Distribution of Electricity
- Distribution projects
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DPWH
- DRRM
- DU
- Durable marking
- DU operated microgrid system
E
- Easement fee
- EC
- Ecosystem
- Ecosystem accounting
- Ecosystem services
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Electronic document
- Employee
- End-consumer
- End-user
- Energy project
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Virtual One-Stop Shop (EVOSS)
- Environmental indicators
- EPIRA
- ERB
- ERC
- EVOSS
G
I
L
- LCCAP
- LGU
- License to Operate (LTO)
- Lifeline Rate
- Liquefied Petroleum Gas (LPG)
- Local Climate Change Action Plan (LCCAP)
- Local Government Unit (LGU)
- Local total electrification roadmap (LTER)
- LPG
- LPG bulk storage tank
- LPG cartridge
- LPG cylinder
- LPG cylinder buyback
- LPG cylinder exchange
- LPG Cylinder Exchange and Swapping Program
- LPG cylinder improvement
- LPG Cylinder Improvement Program
- LPG Cylinder Improvement Program fund
- LPG cylinder owner
- LPG cylinder swapping
- LPG cylinder swapping center
- LPG Industry Development Plan
- LPG industry participants
- LPG Industry Regulation Act
- LPG pressure vessel
- LPG seal
- LTER
- LTO
M
N
- National Building Code of the Philippines
- National Climate Change Action Plan (NCCAP)
- National Commission on Indigenous People (NCIP)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Grid Corporation of the Philippines (NGCP)
- National Housing Authority (NHA)
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- Natural capital
- Natural Capital Accounting
- NCCAP
- NCIP
- NEA
- NFSCC
- NGCP
- NHA
- NPC
- NPC Graduation Plan
- NTER
P
- PEC
- PENCAS Act
- PEP
- Permanent marking
- Permit
- Permitting process
- Philippine Coconut Authority (PCA)
- Philippine Distribution Code (PDC)
- Philippine Ecosystem and Natural Capital Accounting System (PENCAS) Act
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine National Police (PNP)
- Philippine National Standards (PNS)
- Philippine Small Grid Guidelines
- Philippine Stock Exchange (PSE)
- Pilferage
- PIOU
- pipeline transportation
- PNP
- Power Development Program (PDP)
- Power lines
- Power Line Corridor (PLC)
- Power line obstruction
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Preferred Financial Package
- Private Investor-Owned Utility (PIOU)
- Privatization
- Procuring entity
- Proponent
- Prospective Disaster Risk Reduction and Management
R
S
- Scrappage
- Seal manufacturer
- Sea level rise
- SO
- SPUG
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Submission (of an electronic document)
- Substandard pressure vessel
- Substantial relocation
- Subtransmission Assets
- Sub-transmission lines
- Sub-transmission system
- Supplier
- Supplier’s charge
- Supply of Electricity
- Swiss Challenge
- Synchronized mode
- System of Environmental-Economic Accounting (SEEA)
- System Operator (SO)
T
- Tall growing plants
- Tare weight
- TDP
- Terminal
- Timeframe
- TR
- Trademark owner
- Training Regulation (TR)
- TRANSCO
- Transmission Charge
- Transmission Development Plan (TDP)
- Transmission Facilities
- Transmission lines
- Transmission Network Provider (TNP)
- Transmission of Electricity
- Transmission projects
- Transmission System