Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- Clearance
- Competition Rules
- Competitive selection process for microgrid system provider (CSP)
- Concessionaire
- Concession Contract
- Condonation
- Consumer
- Contestable Market
- Contiguous Area
- Contiguous Areas
- Control
- Controlled items
- Cooperative Development Authority (CDA)
- Corporation Code
- CSP
- Cyber-attack
D
- DAS
- DBM
- DBT
- Decentralized power generation (DPG)
- Decommissioning
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Design basis threat (DBT)
- Device
- DIS
- Disposal
- Distribution Asset Study (DAS)
- Distribution Code
- Distribution Impact Study (DIS)
- Distribution of Electricity
- Distribution Services and Open Access Rules (DSOAR)
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Dose limit
- DPG
- DSOAR
- DU
- DU operated microgrid system
E
- EC
- ECA
- Economic Zones (EZs)
- EG
- EGCS
- Electricity End-User
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Embedded Generator (EG)
- Emission Controlled Areas (ECA)
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- ERB
- ERC
- Excluded
- Exclusion
- Exempt
- Exemption
- Exhaust Gas Cleaning System (EGCS)
- Export
- EZs
F
I
- IAEA
- ILW
- IMO
- Import
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Infrastructure Projects
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
- Island mode
- Isolated microgrid system
L
M
- Marginalized End-users
- MARINA
- Maritime Industry Authority (MARINA)
- Market Fees
- Market Operator (MO)
- MARPOL Annex VI
- MARPOL Convention
- Material Out of Regulatory Control (MORC)
- Merit Order Dispatch Instructions
- MGSP
- Microgrid system
- Microgrid Systems Act
- Microgrid system provider service contract (MSC)
- Microgrid system provider (MGSP)
- Missionary electrification
- MO
- MORC
- MSC
N
- National Electrification Administration (NEA)
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- NEA
- Notification
- NPC
- NPC Graduation Plan
- NTER
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
P
- PEC
- Peer-to-Peer Energy Trading (P2P Energy Trading)
- PEP
- Person
- Phase-in LSFO Implementation Roadmap
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Distribution Code (PDC)
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine Energy Research and Policy Institute Act
- Philippine National Nuclear Energy Safety Act
- Philippine Stock Exchange (PSE)
- Physical protection
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Pressurized water reactors (PWRs)
- Privatization
- Prosumer
- PWRs
- P2P Energy Trading
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Recognized Organizations (ROs)
- Referendum
- Registration
- Related Group
- Representative Threat Statements (RTS)
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- Roof-mounted Solar Facility (RSF)
- Roof-mounted Solar Provider (RSP)
- RORB
- ROs
- RSF
- RSP
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Safeguards
- Safeguards Agreements
- Safety
- Scrubber
- SDA
- SECA
- Security
- Self-Generation Facility
- Sensitive digital assets (SDAs)
- Ship
- Ship Specific Implementation Plan (SIP)
- SIP
- SIS
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Source
- Spent fuel
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Sulphur Emission Control Areas (SECA)
- Supplier
- Supplier’s charge
- Supply of Electricity
- Synchronized mode
- System Impact Study (SIS)