Terms and their meanings
A
B
C
- Capacity
- Captive Market
- CDA
- Centralized vehicle-to-grid facilities
- Central Dispatch
- Certificate of Inspection
- Charging fee
- Charging station
- Charging station service provider
- Commercial use charging stations
- Competition Rules
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Control
- Conventional Energy Sources
- Conventional Transportation System
- Cooperative Development Authority (CDA)
- Corporation Code
- CREVI
D
- DA
- DBM
- Decommissioning and Abandonment
- Delivery
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Labor and Employment (DOLE)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Department of Transportation and Communications (DOTC)
- Diesel
- Distribution
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DTI
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Vehicle Industry Development Act (EVIDA)
- Electric vehicle (EV)
- Embedded Generator (EG)
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- ERB
- ERC
- EV
- EV industry
- EZs
I
L
M
N
O
P
- Participant
- PCA
- PDNGI
- PDNGI Facility
- PDNG Dev Plan
- PDNG Distribution Code
- PDNG Distribution Dev Plan
- PDNG Transmission Code
- PDNG Transmission Dev Plan
- PDNG Transmission System
- PEP
- Permit
- Permit Holder
- Petroleum Depot
- Petroleum Terminal
- Philippine Biofuels Program
- Philippine Downstream Natural Gas Development Plan (PDNG Dev Plan)
- Philippine Downstream Natural Gas Distribution Code (PDNG Distribution Code)
- Philippine Downstream Natural Gas Distribution Development Plan (PDNG Distribution Dev Plan)
- Philippine Downstream Natural Gas Distribution System (PDNG Distribution System)
- Philippine Downstream Natural Gas Industry (PDNGI)
- Philippine Downstream Natural Gas Transmission Code (PDNG Transmission Code)
- Philippine Downstream Natural Gas Transmission Development Plan (PDNG Transmission Dev Plan)
- Philippine Downstream Natural Gas Transmission System (PDNG Transmission System)
- Philippine Energy Plan (PEP)
- Philippine LNG Storage and Regasification Terminal Code (PLSR Terminal Code)
- Philippine LNG Storage and Regasification Terminal Development Plan
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- PLSR Terminal Code
- Plug-in hybrid electric vehicle
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Private buildings and establishments
- Privatization
- Public buildings and establishments
- Public Utility Vehicle (PUV)
- PUV
R
S
- Self-generating charging stations
- Self-Generation Facility
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- SPUG
- SRA
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Sugarcane industry
- Supplier
- Supplier’s charge
- Supply
- Supply of Electricity