Terms and their meanings
A
B
- Basic Model
- Basic Type
- Batch No.
- Battery electric vehicle (BEV)
- Battery EV
- Battery swapping station
- BEV
- Billing
- BIR
- Board of Investments (BOI)
- BOI
- Bonafide Member
- BOT
- Bottom Ash
- BPS Recognized Conformity Assessment Body (CAB)
- BP 100-B Form
- BTr
- Buffer zone
- Build-Operate-Transfer (BOT)
- Bureau of Internal Revenue (BIR)
- Bureau of Treasury (BTr)
- Buyer
C
- Captive Market
- CDA
- Centralized vehicle-to-grid facilities
- Central Dispatch
- CERCD
- Certificate of Conditional Release
- Certificate of Exemption
- Certificate of Inspection
- Certification
- Certification Body
- Charging fee
- Charging station
- Charging station service provider
- Code
- Collection
- Commercial use charging stations
- Commercial-scale WTE facility
- Competition Rules
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Concessionaire
- Concession Contract
- Condonation
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contestable Market
- Contiguous Area
- Continuous Emissions Monitoring System
- Control
- Conventional Energy Resource Compliance Division (CERCD)
- Cooperative Development Authority (CDA)
- Corporation Code
- Cylinder container
- Cylinder valve
D
- DBM
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Determination
- Disbursement
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Domestic regulator
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Vehicle Industry Development Act (EVIDA)
- Electric vehicle (EV)
- Embedded Generator (EG)
- Emission
- Emission Fees
- End-user
- Energized Area
- Energy
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Environmental risk assessment
- ERB
- ERC
- Estimated Revenues
- EV
- Evaluation
- EVIDA
- EV industry
- Excess-flow valve
- EZs
G
H
I
- ICC
- IMO
- Importer
- Import Commodity Clearance (ICC)
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Inspection
- Inspection body
- International Standard
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
M
N
P
- PAGCOR
- PCD
- PCSO
- PEP
- Person
- Philippine Amusement and Gaming Corporation (PAGCOR)
- Philippine Charity Sweepstakes Office (PCSO)
- Philippine Energy Plan (PEP)
- Philippine National Oil Company (PNOC)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Plug-in hybrid electric vehicle
- PNOC
- Pollution Abatement System
- Power Commission
- Power Compliance Division (PCD)
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Pressure Relief Valve
- Pre-processing
- Private buildings and establishments
- Privatization
- Product Certification
- PS License
- Public buildings and establishments
R
- Radiograph
- Referendum
- Regulator
- Related Group
- REMB
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Trust Fund (RETF)
- Repair
- Repairer
- Requalification
- Requalifier
- Resource recovery
- Restructuring
- Retail Competition
- Retail Rate
- RETF Account
- RETF Contributors
- Return-On-Rate-Base (RORB)
- Review
- RORB
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Sampling
- Scrapped cylinder
- Self-generating charging stations
- Self-Generation Facility
- Serial No.
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- SOC
- Solid Waste Management Plan
- Sources of Fund Agencies/Entities
- SPUG
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity
- Surveillance
- SWM Plan