Terms and their meanings
A
B
- Battery electric vehicle (BEV)
- Battery Energy Storage System (BESS)
- Battery EV
- Battery swapping station
- BESS
- BEV
- Biodiesel
- Bioethanol
- Biofuel
- Biofuel Blends
- Biofuel Distributor
- Biofuel Feedstock Producer
- Biofuel Producer
- Biofuel Production Site
- BIR
- Board of Investments (BOI)
- BOI
- Bonafide Member
- BOT
- Bottom Ash
- Buffer zone
- Build-Operate-Transfer (BOT)
- Bureau of Internal Revenue (BIR)
- Buyer
C
- CAES
- Captive Market
- CDA
- Centralized vehicle-to-grid facilities
- Central Dispatch
- Certificate of Compliance (COC)
- Certificate of Fuel Additive Registration (CFAR)
- Certificate of Inspection
- Certificate of Non-Overlap
- Certification Precondition
- CFAR
- Charging fee
- Charging station
- Charging station service provider
- COC
- Commercial use charging stations
- Commercial-scale WTE facility
- Community-based Biofuel Producer
- Competition Rules
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Continuous Emissions Monitoring System
- Control
- Conventional Plant
- Cooperative Development Authority (CDA)
- Corporation Code
D
- DBM
- Decentralized power generation (DPG)
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- DER
- Distributed Energy Resources (DER)
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Vehicle Industry Development Act (EVIDA)
- Electric vehicle (EV)
- Embedded Generator (EG)
- Emission
- End-user
- Energized Area
- Energy
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Storage System (ESS)
- Environmental risk assessment
- ERB
- ERC
- EV
- EVIDA
- EV industry
- EZs
F
G
I
- Illegal Conversion
- IMO
- Importer
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Integrated Non-RE Plant and ESS
- Integrated RE Plant and ESS
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- Irrigable Lands
- Irrigated Lands
M
N
P
- PEP
- Person
- Philippine Energy Plan (PEP)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Plug-in hybrid electric vehicle
- PNS
- Pollution Abatement System
- Power Commission
- Power Development Program (PDP)
- Power Quality
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Pre-processing
- Private Agricultural Lands
- Private buildings and establishments
- Privatization
- PSH
- Public buildings and establishments
- Pumped-Storage Hydropower (PSH)
R
- Raw Materials
- Reclassification of Agricultural Lands
- Referendum
- Related Group
- Renewable Energy Sources (RE Sources)
- Resource recovery
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- RE Sources
- RORB
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Self-generating charging stations
- Self-Generation Facility
- SGO
- SGSO
- Small Distribution Company
- Small Grid
- Small Grid Owner (SGO)
- Small Grid System Operator (SGSO)
- Small Power Utilities Group (SPUG)
- SO
- Social Amelioration and Welfare Program
- Solid Waste Management Plan
- SPUG
- Stand-alone Energy Storage System
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity
- SWM Plan
- System Operator (SO)