Terms and their meanings
A
B
C
- Captive Market
- Cartelization
- Central Dispatch
- Certificate of Compliance (COC)
- Certificate of Fuel Additive Registration (CFAR)
- Certificate of Non-Overlap
- Certification Precondition
- CFAR
- CI
- Clearance
- COC
- Collection
- Collection Point
- Commission
- Community-based Biofuel Producer
- Concession Contract
- Consolidation Center
- Contestable Market
- Contingency Plan
- Controlled items
- Co-Generation Facility
- Critical Infrastructure (CI)
- Crude Oil
- Customer Service Charge
- Cyber-attack
D
- DBT
- Dealer
- Decommissioning
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Design basis threat (DBT)
- Device
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disposal
- Disruptive events
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- Distributor
- DOE
- DOF
- DOI
- Dose limit
- Downstream Oil Industry (DOI)
- DU
E
F
I
- IAEA
- Illegal Conversion
- ILW
- Import
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Intensity
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
- Irrigable Lands
- Irrigated Lands
- Isolated Distribution System
L
M
N
P
- PAP
- PEIS
- PEP
- Person
- Petroleum
- Petroleum Products
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Energy Plan (PEP)
- Philippine National Nuclear Energy Safety Act
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- Physical protection
- PNS
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Predatory Pricing
- Pressurized water reactors (PWRs)
- Priority Action Plan (PAP)
- Private Agricultural Lands
- Privatization
- Producer
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Rapid Earthquake Damage Assessment System (REDAS)
- Raw Materials
- RCP
- Reclassification of Agricultural Lands
- Recovery
- Recycling
- REDAS
- Refiller
- Refilling plant
- Refiner
- Registration
- Renewable Energy Sources (RE Sources)
- Representative Threat Statements (RTS)
- Resiliency Compliance Plan (RCP)
- Restructuring
- Retail Rate
- RE Sources
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- Security
- Seller
- Sensitive digital assets (SDAs)
- Social Amelioration and Welfare Program
- Source
- Spent fuel
- SPUG
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity