Terms and their meanings
A
B
C
- Captive Market
- Centralized LPG piping system
- Central Dispatch
- Certificate of Authority (COA)
- Certificate of Confirmation of Commerciality (COCOC)
- Certificate of Registration (COR)
- Civil Code of the Philippines
- Climate Change
- COA
- COCOC
- Commercial Operations
- Commercial Quantities
- Commission
- Concession Contract
- Contestable Market
- Contract Area
- Contract Year
- Conveyance of electricity
- COR
- Co-Generation Facility
- Cross-filling
- Customer Service Charge
D
- Dangeous building
- Dangerous structure
- Dealer
- Declaration of Commerciality (DOC)
- Defective pressure vessel
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Department of Interior and Local Government (DILG)
- Direct Application
- Distribution Code
- Distribution lines
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOC
- DOE
- DOF
- DU
- Durable marking
E
- Easement fee
- EC
- Ecosystem
- Ecosystem accounting
- Ecosystem services
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- End-consumer
- End-user
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Environmental indicators
- EPIRA
- ERB
- ERC
G
I
L
- Letter of Intent (LOI)
- License to Operate (LTO)
- Lifeline Rate
- Liquefied Petroleum Gas (LPG)
- LOI
- LPG
- LPG bulk storage tank
- LPG cartridge
- LPG cylinder
- LPG cylinder buyback
- LPG cylinder exchange
- LPG Cylinder Exchange and Swapping Program
- LPG cylinder improvement
- LPG Cylinder Improvement Program
- LPG Cylinder Improvement Program fund
- LPG cylinder owner
- LPG cylinder swapping
- LPG cylinder swapping center
- LPG Industry Development Plan
- LPG industry participants
- LPG Industry Regulation Act
- LPG pressure vessel
- LPG seal
- LTO
N
O
P
- PDA
- PEC
- PENCAS Act
- PEP
- Permanent marking
- Petroleum Fuel Product Adulteration
- Philippine Ecosystem and Natural Capital Accounting System (PENCAS) Act
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine Green Jobs Act of 2016
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Pilferage
- PLC
- Power Development Program (PDP)
- Power lines
- Power line obstruction
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Pre-Determined Area (PDA)
- Privatization
- Production Area
R
- Refiller
- Refilling plant
- Refiner
- REMB
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Operating Contract (RE Operating Contract)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Repair
- Repairer
- Requalification
- Requalifier
- Restructuring
- Retail outlet
- Retail Rate
- RE Applicant
- RE Application
- RE Developers
- RE Operating Contract
- RE Project
- RE Project for Non-Commercial Operations
- RE Project for Own-Use
S
- Scrappage
- Seal manufacturer
- SEOC
- Solar Energy Operating Contract (SEOC)
- SPUG
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Substandard pressure vessel
- Subtransmission Assets
- Sub-transmission lines
- Sub-transmission system
- Supplier
- Supplier’s charge
- Supply of Electricity
- Sustainable development
- System of Environmental-Economic Accounting (SEEA)