Terms and their meanings
A
B
C
- Captive Market
- Cartelization
- Central Dispatch
- Clearance
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Commercial-scale WTE facility
- Commission
- Concession Contract
- Contestable Market
- Continuous Emissions Monitoring System
- Controlled items
- Co-Generation Facility
- Crude Oil
- Customer Service Charge
- Cyber-attack
D
- DBT
- Dealer
- Decommissioning
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Design basis threat (DBT)
- Device
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Disposal
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DOI
- Dose limit
- Downstream Oil Industry (DOI)
- DRRM
- DU
E
G
I
- IAEA
- ILW
- Import
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- Intervention
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- Ionizing radiation
- IPP
- IPP Administrator
- Isolated Distribution System
L
M
N
- National Climate Change Action Plan (NCCAP)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NCCAP
- NEA
- New Industry Participants
- NFSCC
- Notification
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
P
- PEP
- Person
- Petroleum
- Petroleum Products
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Energy Plan (PEP)
- Philippine National Nuclear Energy Safety Act
- Philippine Stock Exchange (PSE)
- Physical protection
- Pollution Abatement System
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- PPP Project
- Practice
- Predatory Pricing
- Preferred Financial Package
- Pressurized water reactors (PWRs)
- Pre-processing
- Privatization
- Prospective Disaster Risk Reduction and Management
- Public-Private Partnership (PPP) Project
- PWRs
R
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- Sea level rise
- Security
- Sensitive digital assets (SDAs)
- Solid Waste Management Plan
- Source
- Spent fuel
- SPUG
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity
- SWM Plan