Terms and their meanings
A
B
C
- Certificate of Authority (COA)
- Certificate of Conditional Release
- Certificate of Confirmation of Commerciality (COCOC)
- Certificate of Exemption
- Certificate of Registration (COR)
- Certification
- Certification Body
- Clearance
- COA
- COCOC
- Code
- Commercial Operations
- Commercial Quantities
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contract Area
- Contract Year
- Controlled items
- COR
- Cost of Goods Sold
- Co-generation systems
- Cyber-attack
- Cylinder container
- Cylinder valve
D
- DBT
- Declaration of Commerciality (DOC)
- Decommissioning
- DENR
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Design basis threat (DBT)
- Determination
- Device
- Direct Application
- Disposal
- Distributed generation
- Distribution of Electricity
- Distribution Utility (DU)
- DOC
- DOE
- DOE Energy Audit Team
- DOF
- Domestic regulator
- Dose limit
- DTI
- DU
E
F
G
H
I
- IAEA
- ICC
- ILW
- Import
- Import Commodity Clearance (ICC)
- Independent Power Producer Contracts of the National Power Corporation (IPP Contracts)
- Inspection
- Inspection body
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- International Standard
- Intervention
- Ionizing radiation
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
M
N
O
P
- PDA
- PEMC
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Electricity Market Corporation (PEMC)
- Philippine National Nuclear Energy Safety Act
- Philippine National Oil Company (PNOC)
- Philippine National Standards (PNS)
- Physical protection
- PNOC
- Power applications
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Practice
- Pressure Relief Valve
- Pressurized water reactors (PWRs)
- Pre-Determined Area (PDA)
- Production Area
- Product Certification
- PSALM
- PS License
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiograph
- Radiological emergency
- Registered RE Developer
- Registration
- Regulator
- REM
- REMB
- Renewable Energy Certificate
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Market (REM)
- Renewable Energy Operating Contract (RE Operating Contract)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Registrar (RE Registrar)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Energy Trust Fund (RETF)
- Renewable Portfolio Standards (RPS)
- Repair
- Repairer
- REPF
- Representative Threat Statements (RTS)
- Requalification
- Requalifier
- RETF
- Review
- RE Act of 2008
- RE Applicant
- RE Application
- RE Certificate
- RE Developers
- RE generating unit with intermittent RE resources
- RE Operating Contract
- RE Project
- RE Project for Non-Commercial Operations
- RE Project for Own-Use
- RE Registrar
- RE Resources
- RE Service Contract
- RE Systems
- RE Trust Fund (RETF)
- RPS
- Rural Electrification
S
- Safeguards
- Safeguards Agreements
- Safety
- Sampling
- Scrapped cylinder
- SDA
- Security
- Sensitive digital assets (SDAs)
- SEOC
- Serial No.
- Small Power Utilities Group (SPUG)
- SOC
- Solar Energy
- Solar Energy Operating Contract (SEOC)
- Solar Energy Systems
- Source
- Spent fuel
- Spot-Check
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Supplier
- Surveillance