Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- CI
- Climate Change
- Climate Change Act of 2009
- Climate Finance
- Climate Risk
- Climate Variability
- Competition Rules
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Contingency Plan
- Control
- Cooperative Development Authority (CDA)
- Corporation Code
- Critical Infrastructure (CI)
D
- DBM
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disaster Risk Reduction and Management (DRRM)
- Disruptive events
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DRRM
- DU
E
G
I
M
N
P
- PAP
- PEIS
- PEP
- Philippine Energy Plan (PEP)
- Philippine Stock Exchange (PSE)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- pipeline transportation
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Priority Action Plan (PAP)
- Privatization
- Prospective Disaster Risk Reduction and Management
R
S
- Sea level rise
- Self-Generation Facility
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity