Terms and their meanings
A
B
C
- Capacity
- Captive Market
- CDA
- Central Dispatch
- Certificate of Conformity
- Competition Rules
- Concessionaire
- Concession Contract
- Condonation
- Contestable Market
- Contiguous Area
- Control
- Conventional Energy Sources
- Conventional Transportation System
- Cooperative Development Authority (CDA)
- Corporation Code
- Co-generation systems
D
- DBM
- Decommissioning and Abandonment
- Delivery
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Distributed generation
- Distribution
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DTI
- DU
E
G
H
I
L
M
N
O
P
- Participant
- PDNGI
- PDNG Dev Plan
- PDNG Distribution Code
- PDNG Distribution Dev Plan
- PDNG Transmission Code
- PDNG Transmission Dev Plan
- PDNG Transmission System
- PEMC
- PEP
- Permit
- Permit Holder
- Persistent Organic Pollutants (POPs)
- Philippine Clean Air Act of 1999
- Philippine Downstream Natural Gas Development Plan (PDNG Dev Plan)
- Philippine Downstream Natural Gas Distribution Code (PDNG Distribution Code)
- Philippine Downstream Natural Gas Distribution Development Plan (PDNG Distribution Dev Plan)
- Philippine Downstream Natural Gas Distribution System (PDNG Distribution System)
- Philippine Downstream Natural Gas Industry (PDNGI)
- Philippine Downstream Natural Gas Transmission Code (PDNG Transmission Code)
- Philippine Downstream Natural Gas Transmission Development Plan (PDNG Transmission Dev Plan)
- Philippine Downstream Natural Gas Transmission System (PDNG Transmission System)
- Philippine Electricity Market Corporation (PEMC)
- Philippine Energy Plan (PEP)
- Philippine LNG Storage and Regasification Terminal Code (PLSR Terminal Code)
- Philippine LNG Storage and Regasification Terminal Development Plan
- Philippine National Oil Company (PNOC)
- Philippine Stock Exchange (PSE)
- PLSR Terminal Code
- PNOC
- Poisonous and toxic fumes
- Pollution control device
- Pollution control technology
- POPs
- Power applications
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- PPP Project
- Privatization
- Public-Private Partnership (PPP) Project
R
- Referendum
- Registered RE Developer
- Related Group
- REM
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Market (REM)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Gases
- Renewable Portfolio Standards (RPS)
- REPF
- Reselling
- Restructuring
- Retail Competition
- Retail Rate
- Return-On-Rate-Base (RORB)
- RE Act of 2008
- RE Developers
- RE generating unit with intermittent RE resources
- RE Resources
- RE Service Contract
- RE Systems
- RORB
- RPS
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Self-Generation Facility
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- Solar Energy
- Solar Energy Systems
- SPUG
- Standard of performance
- Stationary source
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- successors-in-interest
- Supplier
- Supplier’s charge
- Supply
- Supply of Electricity