Terms and their meanings
A
B
C
- Centralized vehicle-to-grid facilities
- Certificate of Compliance (COC)
- Certificate of Inspection
- Charging fee
- Charging station
- Charging station service provider
- CI
- Clearance
- Climate Change
- COC
- Commercial use charging stations
- Competitive selection process for microgrid system provider (CSP)
- Comprehensive Roadmap for the Electric Vehicle Industry (CREVI)
- Contingency Plan
- Controlled items
- Cost of Goods Sold
- Co-generation systems
- Critical Infrastructure (CI)
- CSP
- Cyber-attack
D
- DBT
- Decentralized power generation (DPG)
- Decommissioning
- DENR
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Design basis threat (DBT)
- Device
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disposal
- Disruptive events
- Distributed generation
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- DOE
- DOF
- Dose limit
- DPG
- DTI
- DU
- DU operated microgrid system
E
G
H
I
L
M
N
- National Government
- National government share
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- Net Metering
- Non-power applications
- Notification
- NPC
- NPC Graduation Plan
- NTER
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
O
P
- PAP
- PEIS
- PEMC
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Distribution Code (PDC)
- Philippine Electricity Market Corporation (PEMC)
- Philippine Green Jobs Act of 2016
- Philippine National Nuclear Energy Safety Act
- Philippine National Oil Company (PNOC)
- Philippine Small Grid Guidelines
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- Physical protection
- PIOU
- Plug-in hybrid electric vehicle
- PNOC
- Power applications
- Practice
- Pressurized water reactors (PWRs)
- Priority Action Plan (PAP)
- Private buildings and establishments
- Private Investor-Owned Utility (PIOU)
- Public buildings and establishments
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Rapid Earthquake Damage Assessment System (REDAS)
- RCP
- REDAS
- Registered RE Developer
- Registration
- REM
- Renewable Energy Certificate
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Market (REM)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Registrar (RE Registrar)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Energy Trust Fund (RETF)
- Renewable Portfolio Standards (RPS)
- REPF
- Representative Threat Statements (RTS)
- Resiliency Compliance Plan (RCP)
- RETF
- RE Act of 2008
- RE Certificate
- RE Developers
- RE generating unit with intermittent RE resources
- RE Registrar
- RE Resources
- RE Service Contract
- RE Systems
- RE Trust Fund (RETF)
- RPS
- Rural Electrification