Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- Certificate of Authority (COA)
- Certificate of Compliance (COC)
- CI
- COC
- Competition Rules
- Competitive selection process for microgrid system provider (CSP)
- Concessionaire
- Concession Contract
- Condonation
- Connection Assets
- Contestable Market
- Contiguous Area
- Contingency Plan
- Control
- Cooperative Development Authority (CDA)
- Corporation Code
- Cost of Goods Sold
- Co-generation systems
- Critical Infrastructure (CI)
- CSP
D
- DBM
- Decentralized power generation (DPG)
- Decommissioning
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disruptive events
- Distributed generation
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DTI
- DU
- DU operated microgrid system
E
- EC
- Economic Zones (EZs)
- EG
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Embedded Generating Facilities
- Embedded Generator (EG)
- Emerging RE Technologies
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Sector
- EPIRA
- ERB
- ERC
- EZs
F
G
H
I
L
M
- Magnitude
- Marginalized End-users
- Market Fees
- Market Operator (MO)
- Merit Order Dispatch Instructions
- MGSP
- MGSP Proponent
- Microgrid system
- Microgrid Systems Act
- Microgrid system provider service contract (MSC)
- Microgrid system provider (MGSP)
- Micro-scale Project
- Missionary electrification
- MO
- Mothballing
- MSC
N
- National Electrification Administration (NEA)
- National Government
- National Government Projects
- National government share
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- NEA
- Network Service Provider (NSP)
- Net Metering
- Non-power applications
- NPC
- NPC Graduation Plan
- NSP
- NTER
P
- PAP
- PEIS
- PEMC
- PEP
- Person
- Philippine Distribution Code (PDC)
- Philippine Electricity Market Corporation (PEMC)
- Philippine Energy Plan (PEP)
- Philippine National Oil Company (PNOC)
- Philippine Small Grid Guidelines
- Philippine Stock Exchange (PSE)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- PIOU
- PNOC
- Power applications
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Prime Commodities
- Priority Action Plan (PAP)
- Private Investor-Owned Utility (PIOU)
- Privatization
R
- Rapid Earthquake Damage Assessment System (REDAS)
- RCP
- REDAS
- Referendum
- Registered RE Developer
- Related Group
- REM
- Renewable Energy Certificate (RE Certificate)
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Market (REM)
- Renewable Energy Policy Framework (REPF)
- Renewable Energy Registrar (RE Registrar)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Systems Developers
- Renewable Energy Systems (RE Systems)
- Renewable Energy Trust Fund (RETF)
- Renewable Portfolio Standards (RPS)
- REPF
- Resiliency Compliance Plan (RCP)
- Restructuring
- Retail Competition
- Retail Rate
- RETF
- Return-On-Rate-Base (RORB)
- RE Act of 2008
- RE Certificate
- RE Developers
- RE generating unit with intermittent RE resources
- RE Registrar
- RE Resources
- RE Service Contract
- RE Systems
- RE Trust Fund (RETF)
- RORB
- RPS
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Self-Generation Facility
- SGSO
- Small Distribution Company
- Small Grid System Operator (SGSO)
- Small Power Utilities Group (SPUG)
- Solar Energy
- Solar Energy Systems
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity
- Swiss Challenge
- Synchronized mode