Terms and their meanings
A
B
C
D
- Dangerous structure
- DBM
- DBT
- Decommissioning
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Human Settlements and Urban Development (DHSUD)
- Department of Interior and Local Government (DILG)
- Department of Public Works and Highways (DPWH)
- Design basis threat (DBT)
- Device
- DHSUD
- DILG
- Disposal
- Distribution lines
- Distribution System
- Distribution Utility (DU)
- Distributor
- DOE
- Dose limit
- DPWH
- DU
E
F
H
I
J
L
- Lamp Wastes
- Lamp Waste Management Facility
- Lamp Waste Management Fee
- Lamp Waste Management System Operator
- LED module
- LGU
- Lifting Month
- Lighting
- Light Water Reactor (LWR)
- LLW
- LMA
- Locally-produced Bioethanol
- Local Government Unit (LGU)
- Local monthly allocation (LMA)
- Low Level Waste (LLW)
- Low Sulphur Fuel Oil (LSFO)
- LSFO
- LWR
M
N
- NABI
- National Building Code of the Philippines
- National Commission on Indigenous People (NCIP)
- National Electrification Administration (NEA)
- National Grid Corporation of the Philippines (NGCP)
- National Housing Authority (NHA)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NCIP
- NEA
- NGCP
- NHA
- Notice of Allowable Bioethanol Importation (NABI)
- Notification
- NPC
- Nuclear emergency
- Nuclear Energy
- Nuclear facility
- Nuclear installation
- Nuclear material
O
P
- PEC
- Person
- Phase-in LSFO Implementation Roadmap
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Coconut Authority (PCA)
- Philippine Electrical Code (PEC)
- Philippine National Nuclear Energy Safety Act
- Philippine National Police (PNP)
- Physical protection
- PNP
- Pollution Abatement System
- Power lines
- Power Line Corridor (PLC)
- Power line obstruction
- Practice
- Pressurized water reactors (PWRs)
- Pre-processing
- Procurement Plan
- Producer
- PWRs
R
S
- Safeguards
- Safeguards Agreements
- Safety
- Scrubber
- SDA
- SECA
- Security
- Seller
- Sensitive digital assets (SDAs)
- Ship
- Ship Specific Implementation Plan (SIP)
- SIP
- Solid Waste Management Plan
- Source
- Spent fuel
- Substantial relocation
- Sub-transmission lines
- Sub-transmission system
- Sulphur Emission Control Areas (SECA)
- Supply Sales
- SWM Plan