Terms and their meanings
A
B
C
D
- Dangerous structure
- DBM
- Decentralized power generation (DPG)
- Demand Side Management
- DENR
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Human Settlements and Urban Development (DHSUD)
- Department of Interior and Local Government (DILG)
- Department of Public Works and Highways (DPWH)
- DER
- DHSUD
- DILG
- Distributed Energy Resources (DER)
- Distribution Code
- Distribution lines
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DPWH
- DU
E
- Easement fee
- EC
- ECA
- Economic Zones (EZs)
- EG
- EGCS
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Embedded Generator (EG)
- Emission Controlled Areas (ECA)
- End-user
- Energized Area
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Storage System (ESS)
- ERB
- ERC
- Exhaust Gas Cleaning System (EGCS)
- EZs
- E-Gasoline
F
I
L
M
N
- NABI
- National Building Code of the Philippines
- National Commission on Indigenous People (NCIP)
- National Electrification Administration (NEA)
- National Grid Corporation of the Philippines (NGCP)
- National Housing Authority (NHA)
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- NCIP
- NEA
- NGCP
- NHA
- Notice of Allowable Bioethanol Importation (NABI)
- NPC
O
P
- PEC
- PEP
- Person
- Phase-in LSFO Implementation Roadmap
- Philippine Coconut Authority (PCA)
- Philippine Electrical Code (PEC)
- Philippine Energy Plan (PEP)
- Philippine National Police (PNP)
- Philippine Stock Exchange (PSE)
- PNP
- Power Commission
- Power Development Program (PDP)
- Power lines
- Power Line Corridor (PLC)
- Power line obstruction
- Power Quality
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Privatization
- Procurement Plan
- PSH
- Pumped-Storage Hydropower (PSH)
R
S
- Scrubber
- SECA
- Self-Generation Facility
- SGO
- SGSO
- Ship
- Ship Specific Implementation Plan (SIP)
- SIP
- Small Distribution Company
- Small Grid
- Small Grid Owner (SGO)
- Small Grid System Operator (SGSO)
- Small Power Utilities Group (SPUG)
- SO
- SPUG
- Stand-alone Energy Storage System
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Substantial relocation
- Subtransmission Assets
- Subtransmission Systems
- Sub-transmission lines
- Sub-transmission system
- Sulphur Emission Control Areas (SECA)
- Supplier
- Supplier’s charge
- Supply of Electricity
- Supply Sales
- System Operator (SO)