Terms and their meanings
A
C
- Captive Market
- CDA
- Centralized LPG piping system
- Central Dispatch
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Commission
- Concession Contract
- Contestable Market
- Cooperative Code
- Cooperative Development Authority (CDA)
- Corporation Code
- Co-Generation Facility
- Cross-filling
D
- Dealer
- Defective pressure vessel
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DRRM
- DU
- Durable marking
E
G
I
L
- LCCAP
- License to Operate (LTO)
- Lifeline Rate
- Liquefied Petroleum Gas (LPG)
- Local Climate Change Action Plan (LCCAP)
- LPG
- LPG bulk storage tank
- LPG cartridge
- LPG cylinder
- LPG cylinder buyback
- LPG cylinder exchange
- LPG Cylinder Exchange and Swapping Program
- LPG cylinder improvement
- LPG Cylinder Improvement Program
- LPG Cylinder Improvement Program fund
- LPG cylinder owner
- LPG cylinder swapping
- LPG cylinder swapping center
- LPG Industry Development Plan
- LPG industry participants
- LPG Industry Regulation Act
- LPG pressure vessel
- LPG seal
- LTO
M
N
- National Climate Change Action Plan (NCCAP)
- National Electrification Administration Reform Act of 2013
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Power Corporation (NPC)
- National Transmission Corporation (TRANSCO)
- Natural capital
- Natural Capital Accounting
- NCCAP
- NEA
- NFSCC
P
- PENCAS Act
- PEP
- Permanent marking
- Philippine Ecosystem and Natural Capital Accounting System (PENCAS) Act
- Philippine Energy Plan (PEP)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- Pilferage
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Preferred Financial Package
- Privatization
- Prospective Disaster Risk Reduction and Management
R
S
- Scrappage
- Seal manufacturer
- Sea level rise
- SEC
- Securities and Exchange Commission (SEC)
- Small Power Utilities Group (SPUG)
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Substandard pressure vessel
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity
- System of Environmental-Economic Accounting (SEEA)