Terms and their meanings
A
B
C
- CDA
- Certificate of Authority (COA)
- Certificate of Confirmation of Commerciality (COCOC)
- Certificate of Registration (COR)
- Civil Code of the Philippines
- Clearance
- COA
- COCOC
- Commercial Operations
- Commercial Quantities
- Commercial-scale WTE facility
- Continuous Emissions Monitoring System
- Contract Area
- Contract Year
- Controlled items
- Conveyance of electricity
- Cooperative Code
- Cooperative Development Authority (CDA)
- COR
- Corporation Code
- Co-firing
- Cyber-attack
D
- Dangeous building
- Dangerous structure
- DBT
- Declaration of Commerciality (DOC)
- Decommissioning
- Department of Energy (DOE)
- Department of Interior and Local Government (DILG)
- Design basis threat (DBT)
- Device
- Direct Application
- Disposal
- Distribution lines
- Distribution System
- Distribution Utility (DU)
- DOC
- Dose limit
- DU
E
- Easement fee
- Electric Cooperative (EC)
- Electric Power Industry Reform Act of 2001 (EPIRA)
- Emission
- End-user
- Energy
- Energy Regulatory Commission (ERC)
- Energy Storage System (ESS)
- Energy Virtual One-Stop Shop (EVOSS)
- Environmental risk assessment
- EPIRA
- ERC
- ESS
- EVOSS
- Excluded
- Exclusion
- Exempt
- Exemption
- Export
F
G
H
- Hazardous activities
- Hazardous improvements
- Hazardous wastes
- Health risk assessment
- Heavy Water Reactor (HWR)
- HEIC
- HFS
- HWR
- Hybrid Systems
- Hydrogen
- Hydrogen Derivative
- Hydrogen Energy
- Hydrogen Energy Industry Activity
- Hydrogen Energy Industry Committee (HEIC)
- Hydrogen Energy Industry Participant
- Hydrogen Energy Project
- Hydrogen Fueling Station (HFS)
- Hydrogen Multigeneration Plant
- Hydropower Service Contract (HSC)
I
J
N
O
P
- PDA
- PEC
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Electrical Code (PEC)
- Philippine Energy Research and Policy Institute
- Philippine Energy Research and Policy Institute Act
- Philippine National Nuclear Energy Safety Act
- Physical protection
- PLC
- Pollution Abatement System
- Power lines
- Power line obstruction
- Practice
- Pressurized water reactors (PWRs)
- Pre-Determined Area (PDA)
- Pre-processing
- Production Area
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- RE
- Registration
- REMB
- Renewable Energy Contract (RE Contract)
- Renewable Energy Developers (RE Developers)
- Renewable Energy Management Bureau (REMB)
- Renewable Energy Operating Contract (RE Operating Contract)
- Renewable Energy Resources (RE Resources)
- Renewable Energy Service Contract (RE Service Contract)
- Renewable Energy Trust Fund (RETF)
- Representative Threat Statements (RTS)
- Resource recovery
- RETF
- RE Applicant
- RE Application
- RE Developers
- RE Operating Contract
- RE Project
- RE Project for Non-Commercial Operations
- RE Project for Own-Use
- RE Trust Fund (RETF)
S
- Safeguards
- Safeguards Agreements
- Safety
- SDA
- SEC
- Securities and Exchange Commission (SEC)
- Security
- Sensitive digital assets (SDAs)
- SEOC
- Small Power Utilities Group (SPUG)
- Solar Energy Operating Contract (SEOC)
- Solid Waste Management Plan
- Source
- Spent fuel
- Stock Cooperative
- Stock Corporation
- Sub-transmission lines
- Sub-transmission system
- SWM Plan