Terms and their meanings
A
C
- Captive Market
- CDA
- Central Dispatch
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Competitive selection process for microgrid system provider (CSP)
- Concession Contract
- Contestable Market
- Control
- Cooperative Development Authority (CDA)
- Crude Oil
- CSP
D
- Dealer
- Decentralized power generation (DPG)
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Downstream Oil Industry (DOI)
- DPG
- DRRM
- DU
- DU operated microgrid system
E
G
I
- Independent Market Operator (IMO)
- Independent Power Producer Contracts of the National Power Corporation (IPP Contracts)
- Independent Power Producer (IPP)
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- Island mode
- Isolated microgrid system
L
M
- Maharlika Investment Fund (MIF)
- Mainstreaming
- Malampaya fund
- MGSP
- Microgrid system
- Microgrid Systems Act
- Microgrid system provider service contract (MSC)
- Microgrid system provider (MGSP)
- MIF
- Mitigation
- Mitigation potential
- MK-SAGF
- MSC
- Murang Kuryente Act
- Murang Kuryente Special Account in the General Fund (MK-SAGF)
N
- National Climate Change Action Plan (NCCAP)
- National Electrification Administration Reform Act of 2013
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- NCCAP
- NEA
- New Industry Participants
- NFSCC
- NPC
- NPC Graduation Plan
- NTER
P
- PEP
- Petroleum
- Petroleum Products
- Philippine Energy Plan (PEP)
- Philippine Stock Exchange (PSE)
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Preferred Financial Package
- Prime Commodities
- Privatization
- Prospective Disaster Risk Reduction and Management
- PSALM