Terms and their meanings
A
B
C
- Captive Market
- CDA
- Central Dispatch
- Certificate of Conditional Release
- Certificate of Exemption
- Certification
- Certification Body
- Code
- Competition Rules
- Composite Team
- Concessionaire
- Concession Contract
- Condonation
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contestable Market
- Contiguous Area
- Control
- Cooperative Development Authority (CDA)
- Corporation Code
- Cylinder container
- Cylinder valve
D
- DBM
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Determination
- Direct Connection
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- Domestic regulator
- DU
E
F
I
- ICC
- IMO
- Import Commodity Clearance (ICC)
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Inspection
- Inspection body
- International Standard
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
M
N
P
- PEP
- Person
- Philippine Energy Plan (PEP)
- Philippine National Standards (PNS)
- Philippine Stock Exchange (PSE)
- pipeline transportation
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Power Supply Agreement (PSA)
- Pressure Relief Valve
- Privatization
- Product Certification
- PSA
- PS License
R
- Radiograph
- REC
- Referendum
- Regulator
- Related Group
- REM Rules
- Renewable Energy Registrar (RE Registrar)
- Renewable Portfolio Standards (RPS)
- Repair
- Repairer
- Requalification
- Requalifier
- Restructuring
- Retail Competition
- Retail Electricity Supplier (RES)
- Retail Rate
- Return-On-Rate-Base (RORB)
- Review
- RORB
- RPS
- RPS Account
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- Sampling
- Scrapped cylinder
- Self-Generation Facility
- Serial No.
- Small Distribution Company
- Small Power Utilities Group (SPUG)
- SOC
- SPUG
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity
- Surveillance