Terms and their meanings
A
B
C
- Captive Market
- Carbon Credit Certificate (CCC)
- CCC
- CDA
- Central Dispatch
- Climate Finance
- Competition Rules
- Composite Team
- Concessionaire
- Concession Contract
- Condonation
- Connection Assets
- Contestable Market
- Contiguous Area
- Control
- Cooperative Development Authority (CDA)
- Corporation Code
- Corresponding Adjustment
D
- DBM
- Decommissioning
- Demand Side Management
- Department of Budget and Management (DBM)
- Department of Energy (DOE)
- Department of Finance (DOF)
- Designated National Authority (DNA)
- Direct Connection
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DNA
- DOE
- DOF
- Double Counting
- DU
E
- EC
- Economic Zones (EZs)
- EG
- Electricity Supply
- Electric Cooperative (EC)
- Electric Power Industry Participant
- Eligibility
- Eligible RE Facility
- Embedded Generating Facilities
- Embedded Generator (EG)
- Emission Reduction
- End-user
- Energized Area
- Energy Certificate
- Energy Mix
- Energy Regulatory Board (ERB)
- Energy Regulatory Commission (ERC)
- Energy Usage Index (EUI)
- ERB
- ERC
- EUI
- EZs
F
G
I
M
N
P
- PEP
- Person
- Philippine Energy Plan (PEP)
- Philippine Statistics Authority – Philippine Standard Industrial Classification (PSA-PSIC)
- Philippine Stock Exchange (PSE)
- Power Commission
- Power Development Program (PDP)
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Power Supply Agreement (PSA)
- Privatization
- PSA
- PSA-PSIC
R
- REC
- Referendum
- Related Group
- REM Rules
- Renewable Energy Registrar (RE Registrar)
- Renewable Portfolio Standards (RPS)
- Restructuring
- Retail Competition
- Retail Electricity Supplier (RES)
- Retail Rate
- Return-On-Rate-Base (RORB)
- RORB
- RPS
- RPS Account
- Rural Electrification
- Rural Electrification Loan
- Rural Electrification Program
S
- SECR
- Self-Generation Facility
- SGSO
- Small Distribution Company
- Small Grid System Operator (SGSO)
- Small Power Utilities Group (SPUG)
- Specific Energy Consumption Requirements (SECR)
- SPUG
- Stock Cooperative
- Stock Corporation
- Stranded Contract Costs of Eligible Contracts of Distribution Utilities
- Stranded Contract Costs of NPC
- Stranded Debts of NPC
- Subtransmission Assets
- Subtransmission Systems
- Supplier
- Supplier’s charge
- Supply of Electricity