Terms and their meanings
A
B
C
- Capacity
- Certificate of Compliance (COC)
- Certificate of Fuel Additive Registration (CFAR)
- Certificate of Non-Overlap
- Certification Precondition
- CFAR
- CI
- Clearance
- COC
- Community-based Biofuel Producer
- Contingency Plan
- Controlled items
- Conventional Energy Sources
- Conventional Transportation System
- Critical Infrastructure (CI)
- Cyber-attack
D
- DBT
- Decommissioning
- Decommissioning and Abandonment
- Delivery
- Department of Energy Act of 1992
- Design basis threat (DBT)
- Device
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disposal
- Disruptive events
- Distribution
- Dose limit
E
F
H
I
L
N
P
- PAP
- Participant
- PDNGI
- PDNGI Facility
- PDNG Dev Plan
- PDNG Distribution Code
- PDNG Distribution Dev Plan
- PDNG Transmission Code
- PDNG Transmission Dev Plan
- PDNG Transmission System
- PEIS
- Permit
- Permit Holder
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Downstream Natural Gas Development Plan (PDNG Dev Plan)
- Philippine Downstream Natural Gas Distribution Code (PDNG Distribution Code)
- Philippine Downstream Natural Gas Distribution Development Plan (PDNG Distribution Dev Plan)
- Philippine Downstream Natural Gas Distribution System (PDNG Distribution System)
- Philippine Downstream Natural Gas Industry (PDNGI)
- Philippine Downstream Natural Gas Transmission Code (PDNG Transmission Code)
- Philippine Downstream Natural Gas Transmission Development Plan (PDNG Transmission Dev Plan)
- Philippine Downstream Natural Gas Transmission System (PDNG Transmission System)
- Philippine Energy Plan (PEP)
- Philippine LNG Storage and Regasification Terminal Code (PLSR Terminal Code)
- Philippine LNG Storage and Regasification Terminal Development Plan
- Philippine National Nuclear Energy Safety Act
- Philippine National Standards (PNS)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- Physical protection
- PLSR Terminal Code
- PNS
- Practice
- Pressurized water reactors (PWRs)
- Priority Action Plan (PAP)
- Private Agricultural Lands
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiological emergency
- Rapid Earthquake Damage Assessment System (REDAS)
- Raw Materials
- RCP
- Reclassification of Agricultural Lands
- REDAS
- Registration
- Rehabilitation
- Renewable Energy Sources (RE Sources)
- Renewable Gases
- Representative Threat Statements (RTS)
- Reselling
- Resiliency Compliance Plan (RCP)
- RE Sources