Terms and their meanings
A
C
- CAES
- Captive Market
- Central Dispatch
- Climate Change
- Climate Change Act of 2009
- Climate Change Office
- Climate Finance
- Climate Risk
- Climate Variability
- Commission
- Competitive selection process for microgrid system provider (CSP)
- Concession Contract
- Connection Assets
- Contestable Market
- Control
- Conventional Plant
- Co-Generation Facility
- CSP
- Customer Service Charge
D
- Decentralized power generation (DPG)
- Decommissioning
- Demand Side Management
- Department of Energy (DOE)
- Department of Finance (DOF)
- DER
- Disaster
- Disaster Risk Reduction and Management (DRRM)
- Distributed Energy Resources (DER)
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DPG
- DRRM
- DU
- DU operated microgrid system
E
G
I
- Independent Market Operator (IMO)
- Independent Power Producer (IPP)
- Integrated Non-RE Plant and ESS
- Integrated RE Plant and ESS
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- Island mode
- Isolated Distribution System
- Isolated microgrid system
L
M
N
- National Climate Change Action Plan (NCCAP)
- National Electrification Administration (NEA)
- National Framework Strategy on Climate Change (NFSCC)
- National Government
- National Government Projects
- National Power Corporation (NPC)
- National total electrification roadmap (NTER)
- National Transmission Corporation (TRANSCO)
- NCCAP
- NEA
- Network Service Provider (NSP)
- NFSCC
- NPC Graduation Plan
- NSP
- NTER
P
- PEP
- Philippine Energy Plan (PEP)
- Philippine Stock Exchange (PSE)
- Power Development Program (PDP)
- Power Quality
- Power Sector Assets and Liabilities Management Corporation (PSALM)
- Preferred Financial Package
- Prime Commodities
- Privatization
- Prospective Disaster Risk Reduction and Management
- PSH
- Pumped-Storage Hydropower (PSH)
S
- Sea level rise
- Self-Generation Facility
- SGO
- SGSO
- Small Grid
- Small Grid Owner (SGO)
- Small Grid System Operator (SGSO)
- SO
- SPUG
- Stand-alone Energy Storage System
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity
- Synchronized mode
- System Operator (SO)