Terms and their meanings
A
B
C
- Captive Market
- Central Dispatch
- Certificate of Conditional Release
- Certificate of Exemption
- Certification
- Certification Body
- Code
- Commission
- Concession Contract
- Conformity
- Conformity Assessment Body (CAB)
- Connection Assets
- Containers
- Contestable Market
- Control
- Co-Generation Facility
- Customer Service Charge
- Cylinder container
- Cylinder valve
D
- DA
- Decommissioning
- Demand Side Management
- DENR
- Department of Energy (DOE)
- Department of Environment Natural Resources (DENR)
- Department of Finance (DOF)
- Department of Labor and Employment (DOLE)
- Department of Science and Technology (DOST)
- Department of Trade and Industry (DTI)
- Department of Transportation and Communications (DOTC)
- Determination
- Diesel
- Distribution Code
- Distribution of Electricity
- Distribution System
- Distribution Utility (DU)
- Distribution Wheeling Charge
- DOE
- DOF
- DOLE
- Domestic regulator
- DOTC
- DTI
- DU
E
G
I
- ICC
- Import Commodity Clearance (ICC)
- Independent Market Operator (IMO)
- Independent Power Producer Contracts of the National Power Corporation (IPP Contracts)
- Independent Power Producer (IPP)
- Inspection
- Inspection body
- International Standard
- Inter-Class Cross Subsidy
- Inter-Regional Grid Cross Subsidy
- Intra- Regional Grid Cross Subsidy
- IPP
- IPP Administrator
- Isolated Distribution System
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
M
N
P
R
S
- Sampling
- Scrapped cylinder
- Self-Generation Facility
- Serial No.
- SGSO
- Small Grid System Operator (SGSO)
- SOC
- SPUG
- Standard
- Statement of Confirmation (SOC)
- Steel cylinder
- Stranded Contract Costs of NPC
- Stranded contract costs of NPC or distribution utility
- Stranded Debts of NPC
- Subtransmission Assets
- Supplier
- Supplier’s charge
- Supply of Electricity
- Surveillance