Terms and their meanings
A
B
C
- Capacity
- Certificate of Conditional Release
- Certificate of Exemption
- Certification
- Certification Body
- CI
- Clearance
- Code
- Conformity
- Conformity Assessment Body (CAB)
- Containers
- Contingency Plan
- Controlled items
- Conventional Energy Sources
- Conventional Transportation System
- Critical Infrastructure (CI)
- Cyber-attack
- Cylinder container
- Cylinder valve
D
- DBT
- Decommissioning
- Decommissioning and Abandonment
- Delivery
- Design basis threat (DBT)
- Determination
- Device
- Disaster
- Disaster Mitigation
- Disaster Preparedness
- Disaster Prevention
- Disaster Recovery
- Disaster Rehabilitation
- Disaster Response
- Disaster Risk Finance
- Disposal
- Disruptive events
- Distribution
- Domestic regulator
- Dose limit
E
I
- IAEA
- ICC
- ILW
- Import
- Import Commodity Clearance (ICC)
- Inspection
- Inspection body
- Intensity
- Intermediate Level Waste (ILW)
- International Atomic Energy Agency (IAEA)
- International Standard
- Intervention
- Ionizing radiation
- ISO 19011
- ISO 9000
- ISO 9001
- ISO/IEC 17020
- ISO/IEC 17021
- ISO/IEC 17025
- ISO/IEC 17065
L
N
P
- PAP
- Participant
- PDNGI
- PDNGI Facility
- PDNG Dev Plan
- PDNG Distribution Code
- PDNG Distribution Dev Plan
- PDNG Transmission Code
- PDNG Transmission Dev Plan
- PDNG Transmission System
- PEIS
- Permit
- Permit Holder
- Person
- PhilATOM
- Philippine Atomic Energy Regulatory Authority (PhilATOM)
- Philippine Downstream Natural Gas Development Plan (PDNG Dev Plan)
- Philippine Downstream Natural Gas Distribution Code (PDNG Distribution Code)
- Philippine Downstream Natural Gas Distribution Development Plan (PDNG Distribution Dev Plan)
- Philippine Downstream Natural Gas Distribution System (PDNG Distribution System)
- Philippine Downstream Natural Gas Industry (PDNGI)
- Philippine Downstream Natural Gas Transmission Code (PDNG Transmission Code)
- Philippine Downstream Natural Gas Transmission Development Plan (PDNG Transmission Dev Plan)
- Philippine Downstream Natural Gas Transmission System (PDNG Transmission System)
- Philippine Energy Plan (PEP)
- Philippine LNG Storage and Regasification Terminal Code (PLSR Terminal Code)
- Philippine LNG Storage and Regasification Terminal Development Plan
- Philippine National Nuclear Energy Safety Act
- Philippine National Standards (PNS)
- PHIVOLCS Earthquake Intensity Scale (PEIS)
- Physical protection
- PLSR Terminal Code
- PPP Project
- Practice
- Pressure Relief Valve
- Pressurized water reactors (PWRs)
- Prime Commodities
- Priority Action Plan (PAP)
- Product Certification
- PS License
- Public-Private Partnership (PPP) Project
- PWRs
R
- Radiation
- Radioactive generator
- Radioactive material
- Radioactive source
- Radioactive waste
- Radiograph
- Radiological emergency
- Rapid Earthquake Damage Assessment System (REDAS)
- RCP
- REDAS
- Registration
- Regulator
- Renewable Gases
- Repair
- Repairer
- Representative Threat Statements (RTS)
- Requalification
- Requalifier
- Reselling
- Resiliency Compliance Plan (RCP)
- Review