Resiliency Compliance Plan (RCP)

In energy contingency: the plan that in general, shall at a minimum contain adaptation measures, which include both structural and non-structural measures, to gauge infrastructure, systems, stockpiling, and human resource preparedness before, during and in the...

Rapid Earthquake Damage Assessment System (REDAS)

In energy contingency: a software developed by the PHIVOLCS in 2022 under a DOST Grant in Aids (DOST GIA) Project. The software can simulate earthquake hazards such as ground shaking, liquefaction, landslides and tsunami. The software can also compute earthquake...

PHIVOLCS Earthquake Intensity Scale (PEIS)

In energy contingency: a 10-point scale being used in the Philippines. This is used to assess the Intensity at a specific location (DOST-PHIVOLCS) [Section 3(u), DOE Department Circular No. DC2023-01-0002, Adoption of the National Energy Contingency Plan for “The Big...

You cannot copy content of this page