In electric power, transmission: new or expanded transmission lines, substations, switchyards, control rooms, towers, and other transmission facilities, beyond the GenCo’s dedicated P2P facility, as determined by the System Impact Study (SIS) and Facilities Study (FS) to be necessary to reliably and securely accommodate the new generation capacity into the grid [Section 2.1, DOE Department Circular No. DC2026-01-0001, Policy on Allowing Generation Companies to Finance and Construct Associated Transmission Projects for the Timely Integration of Power Projects Critical to the Country’s Energy Transition and Supply Security, https://d24qbtp4vooyzi.cloudfront.net/api/media/file/DC2026-01-0001.pdf?prefix=dev%2Fmedia]