Oct 27, 2026 | Category: All, DOE Issuances, Issuances
See Point-to-Point (P2P).
Oct 27, 2026 | Category: All, DOE Issuances, Issuances
In electric power, transmission: transmission facilities required only for the purpose of connecting to the grid, which will be used solely by the GenCo, and not used to serve end-users or suppliers directly [Section 2.3, DOE Department Circular No. DC2026-01-0001,...
Oct 27, 2026 | Category: All, DOE Issuances, Issuances
See Generation Company (GenCo).
Oct 27, 2026 | Category: All, DOE Issuances, Issuances
In electric power, transmission: new or expanded transmission lines, substations, switchyards, control rooms, towers, and other transmission facilities, beyond the GenCo’s dedicated P2P facility, as determined by the System Impact Study (SIS) and Facilities Study (FS)...
Oct 27, 2026 | Category: All, DOE Issuances, Issuances
See Micro-Solar Systems (MSS).
Oct 27, 2026 | Category: All, DOE Issuances, Issuances
See Micro-Solar Systems (MSS).